开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
亚马逊创始人贝佐斯:(谈蓝色起源事件)我们将重建所有需要重建的部分,并恢复飞行。
2026-05-29
亚马逊创始人贝佐斯:(谈蓝色起源事件)我们将重建所有需要重建的部分,并恢复飞行。
返回
其他消息
2026-05-29
At a Ministry of Water Resources briefing, year-to-date accumulated precipitation across China was 170 mm, about 5% above the seasonal norm. Major rivers remain broadly stable, but 146 rivers in 18 provinces have exceeded flood-warning levels since the flood season began — roughly 50% above the five-year same-period average of 96, with most cases in small- and medium-sized rivers. From June 1 China entered full flood season and the south has moved into its main flood period. The ministry said it
At a Ministry of Water Resources briefing, year-to-date accumulated precipitation across China was 170 mm, about 5% above the seasonal norm. Major rivers remain broadly stable, but 146 rivers in 18 provinces have exceeded flood-warning levels since the flood season began — roughly 50% above the five-year same-period average of 96, with most cases in small- and medium-sized rivers. From June 1 China entered full flood season and the south has moved into its main flood period. The ministry said it will intensify duty rostering, early warning and flood response for small- and medium-sized rivers and ensure safety of water infrastructure.
2026-05-29
Tokyo Electric Power Company (TEPCO) said on the 28th (local) it will begin removing remaining spent fuel from the Unit 2 spent fuel pool at Fukushima Daiichi in early next month. The operation is expected to take more than two years and TEPCO said it will proceed cautiously. Units 1–3 suffered core meltdowns after the March 11, 2011 earthquake and tsunami, producing about 880 tonnes of highly radioactive core debris; removal of that debris is viewed as the biggest challenge in decommissioning F
Tokyo Electric Power Company (TEPCO) said on the 28th (local) it will begin removing remaining spent fuel from the Unit 2 spent fuel pool at Fukushima Daiichi in early next month. The operation is expected to take more than two years and TEPCO said it will proceed cautiously. Units 1–3 suffered core meltdowns after the March 11, 2011 earthquake and tsunami, producing about 880 tonnes of highly radioactive core debris; removal of that debris is viewed as the biggest challenge in decommissioning Fukushima Daiichi.
Chat with us
, powered by
LiveChat