China's summer rail transport period runs July 1–Aug 31 (62 days). Railways expect to carry 1.01 bln passengers in the period, averaging 16.29 mln passengers per day. From 00:00 July 1 China's national rail network is operating its third-quarter timetable, scheduling 12,174 timetabled passenger trains, up 106 from the previous schedule.

2026-07-01

China's summer rail transport period runs July 1–Aug 31 (62 days). Railways expect to carry 1.01 bln passengers in the period, averaging 16.29 mln passengers per day. From 00:00 July 1 China's national rail network is operating its third-quarter timetable, scheduling 12,174 timetabled passenger trains, up 106 from the previous schedule.