开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
以色列能源部长:天然气招标过程将分为三个阶段,预计在12个月内完成。
2026-07-06
以色列能源部长:天然气招标过程将分为三个阶段,预计在12个月内完成。
返回
其他消息
2026-07-06
On July 6 combined turnover on the Shanghai and Shenzhen exchanges was CNY 3.0911 tln, down CNY 91.33 bln versus the prior session. Shanghai turnover was CNY 1.4321 tln (prev. CNY 1.4656 tln), volume 590m lots (602m); Shenzhen turnover was CNY 1.6590 tln (prev. CNY 1.7169 tln), volume 768m lots (786m). Zhaoyi Innovation led stock turnover at CNY 39.77 bln, followed by Zhongji Xuchuang CNY 34.70 bln, BOE Technology A CNY 29.71 bln, Xinyisheng CNY 22.15 bln and Jiangbolong CNY 20.23 bln.
On July 6 combined turnover on the Shanghai and Shenzhen exchanges was CNY 3.0911 tln, down CNY 91.33 bln versus the prior session. Shanghai turnover was CNY 1.4321 tln (prev. CNY 1.4656 tln), volume 590m lots (602m); Shenzhen turnover was CNY 1.6590 tln (prev. CNY 1.7169 tln), volume 768m lots (786m). Zhaoyi Innovation led stock turnover at CNY 39.77 bln, followed by Zhongji Xuchuang CNY 34.70 bln, BOE Technology A CNY 29.71 bln, Xinyisheng CNY 22.15 bln and Jiangbolong CNY 20.23 bln.
2026-07-06
SemiAnalysis said NVIDIA (NVDA.O) has delayed its next-generation flagship Kyber rack architecture—designed for the 2027 Rubin Ultra chip—by more than 12 months to 2028 after encountering manufacturing problems with the system's PCB mid-board. SemiAnalysis said NVIDIA currently has no mature solution to scale Rubin Ultra, a shortfall that could open a rare technical window for competitors AMD (AMD.O) and Google (GOOG.O), whose in-house chips have been adopted in leading AI labs.
SemiAnalysis said NVIDIA (NVDA.O) has delayed its next-generation flagship Kyber rack architecture—designed for the 2027 Rubin Ultra chip—by more than 12 months to 2028 after encountering manufacturing problems with the system's PCB mid-board. SemiAnalysis said NVIDIA currently has no mature solution to scale Rubin Ultra, a shortfall that could open a rare technical window for competitors AMD (AMD.O) and Google (GOOG.O), whose in-house chips have been adopted in leading AI labs.
Chat with us
, powered by
LiveChat