开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
Interfax reported Russian forces seized the settlement of Petro-Ivanivka in Ukraine's Kharkiv region.
2026-07-07
Interfax reported Russian forces seized the settlement of Petro-Ivanivka in Ukraine's Kharkiv region.
返回
其他消息
2026-07-07
MSCI will suspend planned increases to the foreign inclusion factor (FIF) and share-count adjustments for Indonesian securities, and will stop adding Indonesian constituents to the MSCI Investable Market Index (IMI).
MSCI will suspend planned increases to the foreign inclusion factor (FIF) and share-count adjustments for Indonesian securities, and will stop adding Indonesian constituents to the MSCI Investable Market Index (IMI).
2026-07-07
CITIC Securities research note says it remains strongly positive on Chinese-made gas turbines exporting overseas. Demand: Siemens Energy raised its multi-year annual gas-turbine demand estimate to about 110–120 GW (from 90–100 GW) on its latest call and reported no sign of demand slowing. Supply: Siemens described industry capacity additions as measured and said industrial gas-turbine expansion will not correct the supply–demand imbalance; over the medium term capacity, efficiency and life‑cycle
CITIC Securities research note says it remains strongly positive on Chinese-made gas turbines exporting overseas. Demand: Siemens Energy raised its multi-year annual gas-turbine demand estimate to about 110–120 GW (from 90–100 GW) on its latest call and reported no sign of demand slowing. Supply: Siemens described industry capacity additions as measured and said industrial gas-turbine expansion will not correct the supply–demand imbalance; over the medium term capacity, efficiency and life‑cycle cost matter more than short‑term availability, and industrial units cannot substitute for large-frame gas turbines. Siemens also flagged short lead-times as a scarce, premium-paying resource for data-center and hyperscale cloud projects. CITIC says recent price/volume pullbacks do not change the medium-term tight balance in the gas-turbine market.
Chat with us
, powered by
LiveChat