开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
加拿大6月就业参与率 65%,预期65.00%,前值65.00%。
2026-07-10
加拿大6月就业参与率 65%,预期65.00%,前值65.00%。
返回
其他消息
2026-07-10
Economy and Finance Minister KIUCHI said on Friday the government will not pre-communicate its preferences on how the Bank of Japan should set interest rates and will not advise on timing or size of rate moves, reiterating that the BOJ decides specific monetary policy tools. His remarks sought to calm markets after a draft economic blueprint urged “appropriately guiding monetary policy” and cited a legal clause requiring the BOJ to align with the government’s economic agenda while omitting langu
Economy and Finance Minister KIUCHI said on Friday the government will not pre-communicate its preferences on how the Bank of Japan should set interest rates and will not advise on timing or size of rate moves, reiterating that the BOJ decides specific monetary policy tools. His remarks sought to calm markets after a draft economic blueprint urged “appropriately guiding monetary policy” and cited a legal clause requiring the BOJ to align with the government’s economic agenda while omitting language on the bank’s legal independence—phrasing that had raised concern the dovish-leaning Prime Minister Sanae Takaichi government might pressure the BOJ to delay tightening. KIUCHI added the government and the BOJ should nonetheless share assessments of the economy, prices and financial conditions.
2026-07-10
Miyun Reservoir operator raised total outflow to 205 m3/s from 135 m3/s effective 09:00 on July 9 to pre-release storage and reserve capacity for storm flood retention. Outflow from the Chahe transfer tunnel was increased to 150 m3/s from 80 m3/s, the highest on record since the reservoir’s construction.
Miyun Reservoir operator raised total outflow to 205 m3/s from 135 m3/s effective 09:00 on July 9 to pre-release storage and reserve capacity for storm flood retention. Outflow from the Chahe transfer tunnel was increased to 150 m3/s from 80 m3/s, the highest on record since the reservoir’s construction.
Chat with us
, powered by
LiveChat