开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
Iraq government spokesman said if the Strait of Hormuz remains closed, the government will turn to external borrowing.
2026-07-31
Iraq government spokesman said if the Strait of Hormuz remains closed, the government will turn to external borrowing.
返回
其他消息
2026-07-30
The Bank of England held Bank Rate at 3.75% as expected; the vote was 6-3 with three members preferring a 25bp hike. Governor Bailey said the pre-existing disinflation trend that existed before the Middle East conflict remains in place, adding: "This offers some initial evidence that inflation inertia may be weaker than previously expected." GBP/USD 1.3381, below 1.3392 before the decision.
The Bank of England held Bank Rate at 3.75% as expected; the vote was 6-3 with three members preferring a 25bp hike. Governor Bailey said the pre-existing disinflation trend that existed before the Middle East conflict remains in place, adding: "This offers some initial evidence that inflation inertia may be weaker than previously expected." GBP/USD 1.3381, below 1.3392 before the decision.
2026-07-30
Historic low Danube water levels have forced Hungary and Romania to take nuclear reactors offline because cooling-water supply cannot be guaranteed. Hungary’s Paks operator said it will shut one of the plant’s four reactors from 13:00 GMT on the 29th. Paks is Hungary’s only nuclear plant, with 2 GW total installed capacity and accounting for roughly half of the country’s electricity. Romania’s energy sector said Cernavodă Unit 2 will be taken offline from 10:00 local time on the 30th; Unit 1 was
Historic low Danube water levels have forced Hungary and Romania to take nuclear reactors offline because cooling-water supply cannot be guaranteed. Hungary’s Paks operator said it will shut one of the plant’s four reactors from 13:00 GMT on the 29th. Paks is Hungary’s only nuclear plant, with 2 GW total installed capacity and accounting for roughly half of the country’s electricity. Romania’s energy sector said Cernavodă Unit 2 will be taken offline from 10:00 local time on the 30th; Unit 1 was shut on the 28th. These outages reduce baseload nuclear generation in both countries.
Chat with us
, powered by
LiveChat