The National Development and Reform Commission and National Energy Administration issued the "15th Five-Year Plan for Petroleum and Natural Gas Development", directing technology R&D across infrastructure and end‑use. Infrastructure priorities include intelligent pipeline construction and inspection, pipeline-network simulation and operational optimization, and smart design/control and digital-twin tech for pipelines and stations to accelerate industry digitalization. The plan mandates R&D on hi

2026-08-17

The National Development and Reform Commission and National Energy Administration issued the "15th Five-Year Plan for Petroleum and Natural Gas Development", directing technology R&D across infrastructure and end‑use. Infrastructure priorities include intelligent pipeline construction and inspection, pipeline-network simulation and operational optimization, and smart design/control and digital-twin tech for pipelines and stations to accelerate industry digitalization. The plan mandates R&D on high‑pressure pure‑hydrogen pipeline materials and safe transport, large‑scale hydrogen blending and repurposing of pipelines for hydrogen, aquifer gas storage and deep underground hydrogen storage, multi‑medium transport (methanol, liquid ammonia) and CCS/CCUS. End‑use priorities include accelerating domestic heavy gas-turbine production, improving in-service gas-turbine maintenance technology, developing high‑efficiency low‑emission vehicle and marine gas engines and high-end gas wall‑hung boilers for localization, and researching optimized, green low‑carbon refinery–petrochemical integration.