开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
U.S. oil import prices fell 7.5% in July; non-oil import prices rose 0.3% in July.
2026-08-18
U.S. oil import prices fell 7.5% in July; non-oil import prices rose 0.3% in July.
返回
其他消息
2026-08-18
UK Maritime Trade Operations said on Aug 18 it received a report that a vessel departing the Strait of Hormuz was struck by an unknown projectile, damaging its engine room; one crew member was injured and may have died. Remaining crew were rescued by the Oman coastguard.
UK Maritime Trade Operations said on Aug 18 it received a report that a vessel departing the Strait of Hormuz was struck by an unknown projectile, damaging its engine room; one crew member was injured and may have died. Remaining crew were rescued by the Oman coastguard.
2026-08-18
Aug. 18 — Tianwan nuclear plant unit 7 in Lianyungang, Jiangsu completed initial fuel loading and has entered fueled commissioning, advancing toward reactor criticality, grid connection and commercial operation. Units 7 and 8 under construction are 1.265 GW each with a 60‑year design life; the project targets commercial operation in 2026 and 2027 respectively. Tianwan plans eight units in total; units 1–6 are already operational and have supplied over 500 billion kWh. With all eight online, tota
Aug. 18 — Tianwan nuclear plant unit 7 in Lianyungang, Jiangsu completed initial fuel loading and has entered fueled commissioning, advancing toward reactor criticality, grid connection and commercial operation. Units 7 and 8 under construction are 1.265 GW each with a 60‑year design life; the project targets commercial operation in 2026 and 2027 respectively. Tianwan plans eight units in total; units 1–6 are already operational and have supplied over 500 billion kWh. With all eight online, total capacity will exceed 9 GW, annual output about 70 billion kWh and CO2 emissions would be cut by roughly 57.4 million tonnes per year.
Chat with us
, powered by
LiveChat