开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
UAE and Egyptian central banks confirm full cooperation and coordination on matters relating to Banque Misr’s UAE branch.
2026-08-30
UAE and Egyptian central banks confirm full cooperation and coordination on matters relating to Banque Misr’s UAE branch.
返回
其他消息
2026-08-30
IRNA reported Iran has completed the legal and administrative procedures required to establish a joint free-trade zone with Turkey at Khoy in northwest Iran and is awaiting action from Turkey to advance and finalise the project. Hosein Forouzan, secretary of Iran’s Supreme Council for Free Trade-Industrial and Special Economic Zones, said the proposed joint zone has entered legal processes after negotiations and has been approved by the Iranian government; implementation will follow a bilateral
IRNA reported Iran has completed the legal and administrative procedures required to establish a joint free-trade zone with Turkey at Khoy in northwest Iran and is awaiting action from Turkey to advance and finalise the project. Hosein Forouzan, secretary of Iran’s Supreme Council for Free Trade-Industrial and Special Economic Zones, said the proposed joint zone has entered legal processes after negotiations and has been approved by the Iranian government; implementation will follow a bilateral memorandum of understanding. He highlighted the strategic importance of the Razi border crossing as a key Iran-Turkey trade route.
2026-08-30
Musk said SpaceX and Tesla are racing to build an annual solar build capacity of 100 GW, but will still need natural gas over the next few years to supplement and start up solar generation. He said the bottleneck for gas-turbine production is casting blades and guide vanes; bringing casting in-house at SpaceX could bring turbines online up to 18 months faster, a potentially transformative improvement.
Musk said SpaceX and Tesla are racing to build an annual solar build capacity of 100 GW, but will still need natural gas over the next few years to supplement and start up solar generation. He said the bottleneck for gas-turbine production is casting blades and guide vanes; bringing casting in-house at SpaceX could bring turbines online up to 18 months faster, a potentially transformative improvement.
Chat with us
, powered by
LiveChat