开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
雪佛龙(CVX.N)首席执行官与委内瑞拉临时总统罗德里格斯会晤。
2026-09-02
雪佛龙(CVX.N)首席执行官与委内瑞拉临时总统罗德里格斯会晤。
返回
其他消息
2026-09-02
Goldman Sachs remains constructive on SK Hynix, with a 12-month target price of KRW 3.5m. Key downside risks: a marked deterioration in memory supply/demand, delays to technology-node upgrades, weaker mobile/PC/server demand, an accelerated Samsung HBM ramp, and a slowdown in AI capex reducing HBM demand.
Goldman Sachs remains constructive on SK Hynix, with a 12-month target price of KRW 3.5m. Key downside risks: a marked deterioration in memory supply/demand, delays to technology-node upgrades, weaker mobile/PC/server demand, an accelerated Samsung HBM ramp, and a slowdown in AI capex reducing HBM demand.
2026-09-02
Deutsche Bank says a persistent 'memory wall' and tight memory supply are reshaping next‑generation AI chip roadmaps. Investors are discussing some new processors cutting HBM configurations as elevated DRAM prices are being built into AI capex calculations. Supply constraints are accelerating alternative approaches, including more SRAM‑dependent inference chips, custom HBM base dies, HBF and other HBM variants. Engineering plans remain fluid with limited supply‑chain visibility; most management
Deutsche Bank says a persistent 'memory wall' and tight memory supply are reshaping next‑generation AI chip roadmaps. Investors are discussing some new processors cutting HBM configurations as elevated DRAM prices are being built into AI capex calculations. Supply constraints are accelerating alternative approaches, including more SRAM‑dependent inference chips, custom HBM base dies, HBF and other HBM variants. Engineering plans remain fluid with limited supply‑chain visibility; most management teams view the problem as primarily economic—cost and affordability—while overall DRAM demand may remain high. Key market signals to watch: HBM capacity and pricing, per‑chip HBM allocations on next‑gen GPUs and ASICs, and whether SRAM, HBF and other substitutes achieve scalable deployment.
Chat with us
, powered by
LiveChat