开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
U.S. Attorney General will hold a press conference at the White House tomorrow.
2026-09-15
U.S. Attorney General will hold a press conference at the White House tomorrow.
返回
其他消息
2026-09-15
China’s Ministry of Industry and Information Technology and National Development and Reform Commission issued a joint electronic information manufacturing plan calling for accelerated development of advanced storage technologies and compute infrastructure. Policy directs promotion of storage‑centric computing and compute‑by‑storage, upgrades to distributed and hyperconverged storage, and the establishment of tiered data‑storage architectures and protocols. It targets breakthroughs in intelligent
China’s Ministry of Industry and Information Technology and National Development and Reform Commission issued a joint electronic information manufacturing plan calling for accelerated development of advanced storage technologies and compute infrastructure. Policy directs promotion of storage‑centric computing and compute‑by‑storage, upgrades to distributed and hyperconverged storage, and the establishment of tiered data‑storage architectures and protocols. It targets breakthroughs in intelligent tiered storage, data sparsification, key‑value caching and the R&D of high‑bandwidth flash, high‑bandwidth memory (HBM), ferroelectric, resistive (ReRAM) and magnetoelectric memories. On facilities and applications, the plan backs hyperscale intelligent‑compute architecture to support AI clusters at the scale of hundreds of thousands of accelerator cards, a full‑chain buildout of space‑based computing with deeper compute‑power co‑design, strengthened distributed edge computing architectures, higher‑performance compilers/databases/middleware, and work on domain‑specific accelerators and large‑scale parallel compute bottlenecks to lift Z‑class supercomputer performance.
2026-09-14
AP reports the East-West pipeline crossing Saudi Arabia, attacked last week, will be largely out of service for several weeks while damaged sections are repaired. The 1,200 km pipeline — central to Saudi plans to route exports via the Red Sea to avoid the Strait of Hormuz, where Iranian attacks have disrupted shipping — has capacity of up to 7 mln bpd. Officials said repairs to major pump stations could take three to five weeks; the line may run partially while repair teams work.
AP reports the East-West pipeline crossing Saudi Arabia, attacked last week, will be largely out of service for several weeks while damaged sections are repaired. The 1,200 km pipeline — central to Saudi plans to route exports via the Red Sea to avoid the Strait of Hormuz, where Iranian attacks have disrupted shipping — has capacity of up to 7 mln bpd. Officials said repairs to major pump stations could take three to five weeks; the line may run partially while repair teams work.
Chat with us
, powered by
LiveChat