開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
股市資金流向圖:今日滬深兩市主力資金淨流出214.45億元,佔比0.6%;大單資金淨流出236.09億元,佔比0.66%;小單資金淨流入376.29億元,佔比1.05%。
2026-06-25
股市資金流向圖:今日滬深兩市主力資金淨流出214.45億元,佔比0.6%;大單資金淨流出236.09億元,佔比0.66%;小單資金淨流入376.29億元,佔比1.05%。
返回
其他消息
2026-06-25
Ukraine said it has received the first tranche of a €3.2 billion loan from the EU, which has been recorded in the state budget. The funds will be used to strengthen defence capabilities and shore up social resilience.
Ukraine said it has received the first tranche of a €3.2 billion loan from the EU, which has been recorded in the state budget. The funds will be used to strengthen defence capabilities and shore up social resilience.
2026-06-25
CHINA STATE PLANNER and the National Energy Administration issued the 15th Five-Year Plan for new energy system construction, calling for accelerated new grid development. The plan prioritizes outbound transmission from clean-energy bases, optimization of sending-end generation mix, and upgrades to channel capacity, utilization efficiency and clean-power share. It targets roughly 40 GW of enhanced interregional complementary capacity across Central–South, Central–East, North China–East China and
CHINA STATE PLANNER and the National Energy Administration issued the 15th Five-Year Plan for new energy system construction, calling for accelerated new grid development. The plan prioritizes outbound transmission from clean-energy bases, optimization of sending-end generation mix, and upgrades to channel capacity, utilization efficiency and clean-power share. It targets roughly 40 GW of enhanced interregional complementary capacity across Central–South, Central–East, North China–East China and Central–Northwest corridors and seeks to consolidate a national grid framework based on regional synchronous grids with asynchronous interconnections. Distribution networks should be transformed into efficient source–grid–load–storage allocation platforms; by 2030 the plan aims to support about 900 GW of distributed clean-energy connections. The plan also pushes faster smart-grid rollout, intelligent dispatch systems to improve renewable consumption, and development of smart microgrids and direct green-power connections where appropriate.
Chat with us
, powered by
LiveChat