Miyun Reservoir operator raised total outflow to 205 m3/s from 135 m3/s
effective 09:00 on July 9 to pre-release storage and reserve capacity for storm
flood retention. Outflow from the Chahe transfer tunnel was increased to 150
m3/s from 80 m3/s, the highest on record since the reservoir’s construction.