開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
伊朗外交部發言人:重開霍爾木茲海峽需美國解除封鎖並提供賠償;與阿曼達成的霍爾木茲海峽協議包含(收取)海事服務費用。
2026-08-10
伊朗外交部發言人:重開霍爾木茲海峽需美國解除封鎖並提供賠償;與阿曼達成的霍爾木茲海峽協議包含(收取)海事服務費用。
返回
其他消息
2026-08-10
Phase I of the Bohai Zhong 19-6 gas field — the Bohai Sea’s first ~100 billion cubic metre-class gas field and a key project in China’s national gas production-storage-supply system — entered full production yesterday, delivering oil-and-gas equivalent of more than 5,200 tonnes per day and outperforming expectations. CNOOC Tianjin said Bohai oilfield’s focus on new-area capacity and lean management of mature fields drove Phase I start-ups at Kenli 10-2 and other hundred‑million‑ton-class fields;
Phase I of the Bohai Zhong 19-6 gas field — the Bohai Sea’s first ~100 billion cubic metre-class gas field and a key project in China’s national gas production-storage-supply system — entered full production yesterday, delivering oil-and-gas equivalent of more than 5,200 tonnes per day and outperforming expectations. CNOOC Tianjin said Bohai oilfield’s focus on new-area capacity and lean management of mature fields drove Phase I start-ups at Kenli 10-2 and other hundred‑million‑ton-class fields; cumulative oil and gas output in 1H exceeded 21 mln tonnes, a record high, accelerating conversion of reserves into production.
2026-08-09
Typhoon White Dolphin (the year’s 13th storm) dropped 104.8 mm of cumulative rain on the eastern Hangjiahu plain. At 20:40 on Aug 9 the Jiaxing gauge on the canal rose to 2.00 m, hitting the flood-number threshold and registering the canal system’s first numbered flood of 2026 (Hangjiahu plain Flood No.1). Forecasts call for concentrated rain over the next 24 hours; together with water-management operations, Jiaxing water level is expected to rise further.
Typhoon White Dolphin (the year’s 13th storm) dropped 104.8 mm of cumulative rain on the eastern Hangjiahu plain. At 20:40 on Aug 9 the Jiaxing gauge on the canal rose to 2.00 m, hitting the flood-number threshold and registering the canal system’s first numbered flood of 2026 (Hangjiahu plain Flood No.1). Forecasts call for concentrated rain over the next 24 hours; together with water-management operations, Jiaxing water level is expected to rise further.
Chat with us
, powered by
LiveChat