開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
伊朗副外長:伊朗將於10月1日主辦《德黑蘭公約》締約方第七次會議。
2026-08-11
伊朗副外長:伊朗將於10月1日主辦《德黑蘭公約》締約方第七次會議。
返回
其他消息
2026-08-11
CATL’s Jiangxi Jianxiawo lithium mine: the mining project’s EIA public notice has closed and the file will move to the approval submission stage. Industry and EIA sources say only the mining EIA is being advanced; the supporting concentrator and tailings storage require separate EIA amendment because of the mineral-type change, and there are no public filings yet—those amendments remain a material hurdle to full resumption. The Ministry of Ecology and Environment’s EIA credit platform shows the
CATL’s Jiangxi Jianxiawo lithium mine: the mining project’s EIA public notice has closed and the file will move to the approval submission stage. Industry and EIA sources say only the mining EIA is being advanced; the supporting concentrator and tailings storage require separate EIA amendment because of the mineral-type change, and there are no public filings yet—those amendments remain a material hurdle to full resumption. The Ministry of Ecology and Environment’s EIA credit platform shows the project name changed from “ceramic clay (including lithium) mine” to “lithium mine” and the project category shifted from 08--012 (chemical mineral/non-metallic mining) to 07--010 (common non-ferrous/precious/rare and rare-earth metals mining). A legal source said the change from non-metallic to rare-metal mining alters the EIA classification and could imply different environmental risk profiles (pollutant types, ecological impact pathways) versus the original EIA. Separately, the project’s tailings storage safety production permit may need extension: Credit China records show the tailings permit was approved on 1 Apr 2025, valid until 14 Jan 2027.
2026-08-10
The Colombian Geological Survey said in a preliminary report a 6.7-magnitude quake occurred at 07:34 local time on Aug. 10. The epicenter was near Chocó department and the focal depth was 82 km. Strong shaking was reported in the capital Bogotá.
The Colombian Geological Survey said in a preliminary report a 6.7-magnitude quake occurred at 07:34 local time on Aug. 10. The epicenter was near Chocó department and the focal depth was 82 km. Strong shaking was reported in the capital Bogotá.
Chat with us
, powered by
LiveChat