開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
丘鈦科技(01478.HK):2026年上半年淨利潤2.76億元,同比減少10.5%
2026-08-24
丘鈦科技(01478.HK):2026年上半年淨利潤2.76億元,同比減少10.5%
返回
其他消息
2026-08-24
Xiaomi Group (01810.HK) announced Xuanjie D100, described as China’s first domestically developed 3nm high-compute autonomous-driving AI chip. The chip uses a 3nm process, pairs a 20-core CPU with a 16-core high-compute NPU, supports up to 160GB unified memory and can locally host 200B-parameter models. Xiaomi says development is complete and commercial deployment is planned for next year.
Xiaomi Group (01810.HK) announced Xuanjie D100, described as China’s first domestically developed 3nm high-compute autonomous-driving AI chip. The chip uses a 3nm process, pairs a 20-core CPU with a 16-core high-compute NPU, supports up to 160GB unified memory and can locally host 200B-parameter models. Xiaomi says development is complete and commercial deployment is planned for next year.
2026-08-24
Goldman Sachs reiterated that if Gulf LNG exports via the Strait of Hormuz do not increase, TTF at €65/MWh is insufficient for Europe to effectively manage winter inventories. If Strait exports fail to improve, TTF must rise further to suppress Asian LNG demand and free cargoes for Europe. Goldman estimates that if Middle East energy exports only gradually normalize by 2027, TTF for December‑2026 delivery may need to exceed €100/MWh (assuming a normal-winter average), versus a €50/MWh base case
Goldman Sachs reiterated that if Gulf LNG exports via the Strait of Hormuz do not increase, TTF at €65/MWh is insufficient for Europe to effectively manage winter inventories. If Strait exports fail to improve, TTF must rise further to suppress Asian LNG demand and free cargoes for Europe. Goldman estimates that if Middle East energy exports only gradually normalize by 2027, TTF for December‑2026 delivery may need to exceed €100/MWh (assuming a normal-winter average), versus a €50/MWh base case — roughly a 110% increase — to materially curb Asian demand.
Chat with us
, powered by
LiveChat