The Tianjin gas-storage branch of Dagang Oilfield said cumulative injections in
the current cycle have exceeded 2 bln cubic meters, reaching 90% of the overall
injection plan and up 8% YoY, a new cycle high that strengthens winter gas
supply for the Beijing-Tianjin-Hebei region.