開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
歐元區8月季調後貿易帳、9月CPI年率及月率終值將於十分鐘後公佈。
2026-10-16
歐元區8月季調後貿易帳、9月CPI年率及月率終值將於十分鐘後公佈。
返回
其他消息
2026-10-16
16 Oct 2026, Bangkok — At the WBG/IMF annual meetings and G20 finance meetings, China met with European Commission economy commissioner Valdis Dombrovskis, ECB President Christine Lagarde and Eurogroup chair Kostis Pierrakakis to discuss macroeconomic policy. China stressed global imbalances are complex, structural issues driven by economic globalization, international division of labor, the dominance of major currencies and differing national macro stances, and have recently been amplified by g
16 Oct 2026, Bangkok — At the WBG/IMF annual meetings and G20 finance meetings, China met with European Commission economy commissioner Valdis Dombrovskis, ECB President Christine Lagarde and Eurogroup chair Kostis Pierrakakis to discuss macroeconomic policy. China stressed global imbalances are complex, structural issues driven by economic globalization, international division of labor, the dominance of major currencies and differing national macro stances, and have recently been amplified by geopolitical tensions and protectionism. China called for openness, cooperation and macro policy coordination to support balanced, sustainable global growth and said it is willing to use China‑EU finance dialogue mechanisms to engage on global economic governance and stronger macro coordination.
2026-10-16
Shanghai Municipal Development and Reform Commission published its 2026 green power direct-connection development and construction plan, adding three projects. Two projects were placed in the implementation pool with combined generation capacity of 32.33 MW and storage of 2 MW/4 MWh; one project was placed in the reserve pool with 49.33 MW generation and 5 MW/10 MWh storage. Projects must target on-site self-consumption of at least 60% of available generation and at least 30% of total electricit
Shanghai Municipal Development and Reform Commission published its 2026 green power direct-connection development and construction plan, adding three projects. Two projects were placed in the implementation pool with combined generation capacity of 32.33 MW and storage of 2 MW/4 MWh; one project was placed in the reserve pool with 49.33 MW generation and 5 MW/10 MWh storage. Projects must target on-site self-consumption of at least 60% of available generation and at least 30% of total electricity consumption. For appraisal, the projects’ average load factor is provisionally set at 40%.
Chat with us
, powered by
LiveChat