Penghui Energy stated on its interactive platform that its solid-state battery pilot line has been built and put into operation; however, the results of the pilot test will take some time to arrive.

2025-11-21

Penghui Energy stated on its interactive platform that its solid-state battery pilot line has been built and put into operation; however, the results of the pilot test will take some time to arrive.