Sources say the Caspian Pipeline Consortium's (CPC) Single Point Mooring Terminal 3 (SPM-3) has been activated after maintenance and is ready to resume crude oil loading.
2026-01-25
Sources say the Caspian Pipeline Consortium's (CPC) Single Point Mooring Terminal 3 (SPM-3) has been activated after maintenance and is ready to resume crude oil loading.