Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
Reserve Bank of India governor said the inf target should be met over time and it is not advisable to take action on every deviation.
2026-06-05
Reserve Bank of India governor said the inf target should be met over time and it is not advisable to take action on every deviation.
Back
Other News
2026-06-05
Online travel platform Fliggy said inbound travel bookings in the past two weeks rose 237% YoY. Source markets Malaysia, South Korea and Canada each recorded increases of more than threefold. Summer inbound hotspots include Shanghai, Guangzhou, Cheng
Online travel platform Fliggy said inbound travel bookings in the past two weeks rose 237% YoY. Source markets Malaysia, South Korea and Canada each recorded increases of more than threefold. Summer inbound hotspots include Shanghai, Guangzhou, Chengdu, Beijing and Xi'an.
2026-06-04
Prices for A2-class high-end fiber preforms — the upstream rods that determine optical-fiber performance — have surged, rising from 22–30 yuan per equivalent core-km in early 2025 to about 160 yuan per equivalent core-km in 2026, an increase of nearl
Prices for A2-class high-end fiber preforms — the upstream rods that determine optical-fiber performance — have surged, rising from 22–30 yuan per equivalent core-km in early 2025 to about 160 yuan per equivalent core-km in 2026, an increase of nearly 550%. Preforms account for roughly 70% of profit allocation in China’s fiber-cable value chain. A2 preforms produce bend-insensitive fiber widely used in AI compute infrastructure and last-mile/FTTH deployments, driving current demand. Capacity expansion typically requires 18–24 months, so supply tightness is likely to persist in phases; firms with existing preform capacity are positioned as the main beneficiaries, while smaller manufacturers may face supply shortages, subcontracting and margin compression.
Chat with us
, powered by
LiveChat