Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
Iran's security council reiterated that the US-Iran agreement includes an immediate and permanent end to hostilities in Lebanon.
2026-06-15
Iran's security council reiterated that the US-Iran agreement includes an immediate and permanent end to hostilities in Lebanon.
Back
Other News
2026-06-15
US 6-month Treasury auction to June 15 — bid-cover ratio 2.76, prior 2.75.
US 6-month Treasury auction to June 15 — bid-cover ratio 2.76, prior 2.75.
2026-06-15
CHINA STATE PLANNER and other agencies instructed the aluminum electrolysis industry to accelerate energy-saving and carbon-reduction retrofits, mandating adoption of technologies including new stable-flow insulated electrolysis cells, graphitized ca
CHINA STATE PLANNER and other agencies instructed the aluminum electrolysis industry to accelerate energy-saving and carbon-reduction retrofits, mandating adoption of technologies including new stable-flow insulated electrolysis cells, graphitized cathodes, higher-quality anodes and sealed gas-collection at cell tops, and promoting 500kA+ large cells. The directive calls for upgrades to motors, fans, pumps, heat pumps, compressors and transformers, optimization of flue-gas waste-heat recovery and cascade use, and wider application of low-temperature waste-heat power generation. It directs accelerated retrofit of sub-300kA prebake cells, independent aluminum-use carbon projects below 150,000 t/yr and older inefficient captive coal-fired units.
Chat with us
, powered by
LiveChat