Microsoft (MSFT.O): When the Pecos data center campus becomes operational, it will operate in conjunction with a gas-fired power generation facility located on the same site.

2026-06-22

Microsoft (MSFT.O): When the Pecos data center campus becomes operational, it will operate in conjunction with a gas-fired power generation facility located on the same site.