Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
Bank of Japan board member Sato Ayano said policymakers need to monitor downside risks to economic growth and upside risks to inflation.
2026-06-30
Bank of Japan board member Sato Ayano said policymakers need to monitor downside risks to economic growth and upside risks to inflation.
Back
Other News
2026-06-30
Jinghe Integrated announced on the Hong Kong Stock Exchange that it plans to issue 216.1 million H shares (subject to the exercise of the over-allotment option) for its Hong Kong listing, with an issue price between HK$30 and HK$32.3 per share, and i
Jinghe Integrated announced on the Hong Kong Stock Exchange that it plans to issue 216.1 million H shares (subject to the exercise of the over-allotment option) for its Hong Kong listing, with an issue price between HK$30 and HK$32.3 per share, and is expected to commence trading on July 10.
2026-06-30
Today (30th), with the final unit at the Shaping I hydropower plant on the Dadu River synchronized to the grid, the Dadu River hydropower base added over 2.0 GW of clean capacity, making it among the first river basins to deliver concentrated, large-
Today (30th), with the final unit at the Shaping I hydropower plant on the Dadu River synchronized to the grid, the Dadu River hydropower base added over 2.0 GW of clean capacity, making it among the first river basins to deliver concentrated, large-scale hydropower commissioning under China’s 15th Five-Year Plan. Sichuan’s total clean-energy installed capacity has exceeded 130 GW, with hydropower accounting for roughly 80% of the mix. In the Yalong River water-wind-solar integrated base, the world’s largest hybrid pumped-storage project, the Lianghekou hybrid pumped-storage power station, has entered a critical phase of full-scale construction.
Chat with us
, powered by
LiveChat