State Grid Shandong Electric Power said at 11:19 on Aug 3 the Shandong grid's peak load reached 131 million kW (131 GW), a record high, about 800,000 kW (800 MW) above last year's 130.21 million kW peak on Aug 22.

2026-08-03

State Grid Shandong Electric Power said at 11:19 on Aug 3 the Shandong grid's peak load reached 131 million kW (131 GW), a record high, about 800,000 kW (800 MW) above last year's 130.21 million kW peak on Aug 22.