The operator stated that the Paks nuclear power plant in Hungary has begun increasing the output power of reactor number 2. Reactor number 2 at the Paks nuclear power plant is expected to be operating at full capacity at 20:00 GMT.
2026-08-11
The operator stated that the Paks nuclear power plant in Hungary has begun increasing the output power of reactor number 2. Reactor number 2 at the Paks nuclear power plant is expected to be operating at full capacity at 20:00 GMT.