Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
The New Taiwan dollar weakened to 31.836 per US dollar, its weakest level since Aug. 26.
2026-09-15
The New Taiwan dollar weakened to 31.836 per US dollar, its weakest level since Aug. 26.
Back
Other News
2026-09-14
U.S. Energy Secretary Wright said the 7‑day rolling average of oil shipments through the Strait of Hormuz is rising and will continue to rise.
U.S. Energy Secretary Wright said the 7‑day rolling average of oil shipments through the Strait of Hormuz is rising and will continue to rise.
2026-09-14
Elon Musk's super semiconductor factory, Terafab, is accelerating equipment procurement. In the second quarter, the company placed a large number of orders for front-end equipment with major equipment suppliers such as ASML, Applied Materials, Lam Re
Elon Musk's super semiconductor factory, Terafab, is accelerating equipment procurement. In the second quarter, the company placed a large number of orders for front-end equipment with major equipment suppliers such as ASML, Applied Materials, Lam Research, and Tokyo Electron. Entering the second half of the year, the focus of procurement is gradually shifting to back-end equipment such as packaging. Hanmi Semiconductor has secured an order from Terafab for semiconductor packaging equipment for its AI systems, becoming the first South Korean company to enter Terafab's back-end equipment supply chain. The equipment will be used in its advanced packaging production lines, but the contract amount, quantity, and specific delivery time have not yet been disclosed. Terafab's current goal is to achieve initial production in 2029, which is a shift from the previously reported timeline of "trial production by the end of 2027 and mass production in 2028."
Chat with us
, powered by
LiveChat