Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
Statistics South Africa: South Africa's total mining output fell 10.7% year-on-year in September. Gold production fell 7.5% year-on-year in September.
2026-11-12
Statistics South Africa: South Africa's total mining output fell 10.7% year-on-year in September. Gold production fell 7.5% year-on-year in September.
Back
Other News
2026-11-13
GOOLSBEE: The Fed has not adequately fulfilled its responsibilities on inflation.
GOOLSBEE: The Fed has not adequately fulfilled its responsibilities on inflation.
2026-11-12
Pablo Vegas, CEO of Texas grid operator ERCOT, plans to request state lawmakers to amend rules to allow the grid to require data centers to reduce power consumption as early as when a Level 1 Electric Emergency Response (EEA) is declared, or even ear
Pablo Vegas, CEO of Texas grid operator ERCOT, plans to request state lawmakers to amend rules to allow the grid to require data centers to reduce power consumption as early as when a Level 1 Electric Emergency Response (EEA) is declared, or even earlier. According to Bloomberg, current rules typically require data centers to reduce load only when the grid enters a Level 2 emergency. Vegas stated that initiating data center load adjustments earlier would help protect residential and business power during power shortages. According to ERCOT's classification system, a Level 1 emergency means that the grid's reserve capacity has fallen below 2,500 megawatts and is not expected to be restored within 30 minutes; at this point, a system-wide rolling blackout has not yet been initiated. The reserve capacity threshold for a Level 2 alert is 2,000 megawatts. Texas's SB6 bill, passed in 2025, already requires large electricity consumers to reduce load after receiving one day's advance notice, but ERCOT stated that it has not previously used this law to require data centers to actually reduce load. Vegas said that data centers proactively reduced power consumption during severe weather last winter.
Chat with us
, powered by
LiveChat