开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
LSEG数据显示,德国次日交付基荷电价下跌31.2%,至176.55欧元/兆瓦时。
2026-09-14
LSEG数据显示,德国次日交付基荷电价下跌31.2%,至176.55欧元/兆瓦时。
返回
其他消息
2026-09-14
TrendForce said on the 14th that SK Hynix’s Q2 DRAM revenue rose 37.9% QoQ to $38.59bn, but its DRAM market share fell from 28.8% to 24.9% (down 3.9 percentage points). Samsung Electronics led with a 39.4% share; Micron held 23.3%, narrowing its gap with SK Hynix to 1.6 percentage points. TrendForce attributed SK Hynix’s share decline not to weak DRAM sales but to a heavier-than-peer mix of high-bandwidth memory (HBM) and production-volume differences with Samsung.
TrendForce said on the 14th that SK Hynix’s Q2 DRAM revenue rose 37.9% QoQ to $38.59bn, but its DRAM market share fell from 28.8% to 24.9% (down 3.9 percentage points). Samsung Electronics led with a 39.4% share; Micron held 23.3%, narrowing its gap with SK Hynix to 1.6 percentage points. TrendForce attributed SK Hynix’s share decline not to weak DRAM sales but to a heavier-than-peer mix of high-bandwidth memory (HBM) and production-volume differences with Samsung.
2026-09-14
In response to investor questions on backlog and delivery timing, Feirongda said operations are normal and its liquid-cooling business and on-hand orders are progressing and being delivered in an orderly manner. The company said it plans dedicated capacity based on market and customer demand and project progress; current capacity utilization is healthy and can effectively ensure customer order fulfillment.
In response to investor questions on backlog and delivery timing, Feirongda said operations are normal and its liquid-cooling business and on-hand orders are progressing and being delivered in an orderly manner. The company said it plans dedicated capacity based on market and customer demand and project progress; current capacity utilization is healthy and can effectively ensure customer order fulfillment.
Chat with us
, powered by
LiveChat