開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
周生生(00116.HK)日內漲超20%,公司料中期應占溢利21億港元至22億港元。
2026-08-18
周生生(00116.HK)日內漲超20%,公司料中期應占溢利21億港元至22億港元。
返回
其他消息
2026-08-18
CHINA'S LI signed a State Council order promulgating amendments to the Housing Provident Fund Management Regulations, effective Sept 20, 2026. Amendments strengthen risk controls: the Ministry of Housing and Urban‑Rural Development will define public credit information for the provident fund sector; provident fund management centers must build comprehensive, accurate credit records and integrate them into the national credit information sharing platform; the rules specify legal liabilities for f
CHINA'S LI signed a State Council order promulgating amendments to the Housing Provident Fund Management Regulations, effective Sept 20, 2026. Amendments strengthen risk controls: the Ministry of Housing and Urban‑Rural Development will define public credit information for the provident fund sector; provident fund management centers must build comprehensive, accurate credit records and integrate them into the national credit information sharing platform; the rules specify legal liabilities for fraudulent withdrawals or obtaining provident fund loans using forged or fraudulent documents. The revisions expand coverage by clarifying that individual business owners, part‑time workers and other flexible‑employment workers may voluntarily contribute to the housing provident fund and, as prescribed, receive corresponding policy support.
2026-08-18
The Three Gorges ship lift has begun its 2026 planned shutdown for maintenance, scheduled to last 42 days. The work is aimed at deep inspection of equipment risks and performance optimization to secure subsequent safe, stable and efficient operation. This is the sixth planned outage since commissioning; maintenance is divided into seven major modules — including metal structures, hydraulic systems and electrical systems — covering 68 specific tasks.
The Three Gorges ship lift has begun its 2026 planned shutdown for maintenance, scheduled to last 42 days. The work is aimed at deep inspection of equipment risks and performance optimization to secure subsequent safe, stable and efficient operation. This is the sixth planned outage since commissioning; maintenance is divided into seven major modules — including metal structures, hydraulic systems and electrical systems — covering 68 specific tasks.
Chat with us
, powered by
LiveChat