Beibu Gulf Port Co. said a vessel carrying 168,000 tonnes of Guinean bauxite docked at Fangchenggang on Oct. 1 and completed berthing, unloading, storage and rail-dispatch operations. The first batch departed by rail to Wanzhou, Chongqing on Oct. 3 t

2026-10-07

Beibu Gulf Port Co. said a vessel carrying 168,000 tonnes of Guinean bauxite docked at Fangchenggang on Oct. 1 and completed berthing, unloading, storage and rail-dispatch operations. The first batch departed by rail to Wanzhou, Chongqing on Oct. 3 to supply Bosai Mining’s Wanzhou plant. The new logistics chain — overseas mine to Beibu Gulf Port entry to direct rail to Chongqing — replaces traditional Yangtze river-sea transport and cuts overall transit time by about 25 days.